First fire in the fireplace, it warmed much of the first and second floor by the end of the day, even without the fan being on. The surround will be granite and the hearth is slate.
Schwalbach Kitchens crew started installation of the cabinets in the kitchen and will do the guest and master bath cabinets next. After the cabinets are in, the template for the countertops will be drawn up, it should be about three weeks until the granite counters arrive.
1 comment:
Wow, fire already! It looks amazing.
Post a Comment